Current LocationCurrent Location:Home > news > construction waste treatment equipment

Intimate after-sales, to ensure that you buy worry-free

Summary of technical highlights of construction waste sorting and processing equipment

Release time:2025 / 07 / 05 16:04:05

As we all know, construction waste is characterized by complex components, such as cement blocks, bricks, soil, and light organic matter (plastics, fibers, wood, etc.). The hardness and hardness of these components vary greatly, and it is difficult to separate them using traditional processing methods. The finished product has complex components, unstable performance, and limited places of use. How to effectively separate mixed materials in construction waste is the focus and difficulty of construction waste resource utilization. A complete set of construction waste treatment equipment makes these problems no longer a big problem.

1. Sorting technology: subdivision of various debris

Pre-sorting and processing of construction waste: preliminary pre-sorting and processing of construction waste raw materials, sorting other easy-to-sort debris and large debris, and stacking and sorting.

2. Automatic iron removal by iron remover: remove residual iron and metal in the mixture of concrete blocks and construction waste.

The manual picking platform consists of a picking belt, a picking room, and a picking box, with a multi-station design to pick up a small amount of impurities such as wood, aluminum, and wire.

3. Intelligent stacking: improve efficiency, environmental protection and energy saving.

The centralized storage system realizes centralized storage, closed transportation, automatic distribution, and unified intelligent management of aggregates; unified management of aggregates, automatic, uninterrupted real-time monitoring of continuous storage operations, improves work efficiency, energy saving, and storage is all environmentally friendly and dust-free.

3. Multiple mixing: realize recycling.

Cement concrete mixing equipment: recycled aggregate → recycled concrete.

Dry mortar mixing equipment: recycled fine aggregate → recycled mortar.

Asphalt mixture mixing equipment: waste asphalt → hot recycled asphalt mixture.

Brick making equipment: construction sludge, stone powder, etc. → recycled unburned bricks.

4. Processing of derivative products: recycling.

Recycling of plastics, cables and tires; recycling of iron and metals; light materials are processed by derivative fuel processing plants; waste wood is processed by waste wood recycling plants.

5. Dust removal system: high efficiency and high performance.

High-efficiency bag dust collector, offline dust removal pulse dust removal, dust removal efficiency up to 99%; Petron peritoneal filter bag filtration performance, dust removal concentration 20mg/m3 (comprehensive working conditions); automatic differential pressure signal feedback, high-performance automatic pulse control.

VI. Business operation model: control process to achieve benefits

Source of construction waste: Construction waste generating units need to clarify the output and planned flow of construction waste, obtain the receipt and treatment certificate of construction waste recycling and treatment sites, and effectively control the flow of construction waste;

Construction waste removal: strictly monitor the removal units or individuals;

Construction waste recycling and treatment sites: regularly report the collection, treatment and reuse of construction waste, and regularly accept the government's equipment feasibility assessment;

Reuse of construction waste recycled products: standardize the acceptance standards of recycled products and introduce relevant promotion policies.

consult
  • 24 Hours

    All day online

    Provide you with a better product experience

  • 30 Seconds

    Respond promptly

    Reply immediately within 30 seconds of consultation